top of page
Abstract Sphere

POWERING AI COMPUTE AT THE SCALE OF DEMAND

We bridge the gap between data center developers facing multi-year grid queues and the behind-the-meter energy assets required to get compute online.

WHAT WE DO

We operate as a specialized infrastructure platform focused exclusively on speed-to-power, off-grid generation, and Energy-as-a-Service (EaaS) execution.

PARAGON ADVISORY

For Data Center Developers & Operators

We help developers solve immediate site bottlenecks and accelerate time-to-power without taking on stranded-asset risk.

PARAGON ADVISORY

For Data Center Developers & Operators

We help developers solve immediate site bottlenecks and accelerate time-to-power without taking on stranded-asset risk.

Air Permitting & EPA Attainment Audits

Determining zip-code-level feasibility for behind-the-meter gas generation before capital is committed.

Tenant Scope 1/2 Lease Structuring

Aligning microgrid power purchase agreements (PPAs) with hyperscaler net-zero mandates.

EaaS RFP Management

Writing technical specifications, running competitive provider bidding, and negotiating bankable 20-year terms.

ADVISORY
ABOUT

EaaS RFP Management

Writing technical specifications, running competitive provider bidding, and negotiating bankable 20-year terms.

Tenant Scope 1/2 Lease Structuring

Aligning microgrid power purchase agreements (PPAs) with hyperscaler net-zero mandates.

Air Permitting & EPA Attainment Audits

Determining zip-code-level feasibility for behind-the-meter gas generation before capital is committed.

PARAGON INFRASTRUCTURE

For Institutional Funds & Energy Partners

We originate, entitle, and co-develop high-capacity, off-grid infrastructure assets ready for capital deployment.

INFRASTRUCTURE

Power-Ready Site Origination

Securing land options adjacent to high-pressure gas pipelines and extra-high-voltage transmission corridors.

Behind-the-Meter Co-Development

Packaging fuel cells, gas, solar, and battery storage (BESS) assets into turn-key Special Purpose Vehicles (SPVs).

Asset Monetization

Transitioning fully de-risked, tenant-backed power assets to long-term infrastructure investors.

THE BOTTLENECK WE SOLVE

SOLUTION

The primary constraint on AI expansion is not chip supply or software design; it is the physical timeline required to connect to the utility grid.

TRADITIONAL GRID PATH
 

(4 - 7 YEARS)

Site Selection ──► Interconnect Queue ──► Utility Delays ──► Delayed Revenue

PARAGON BEHIND-THE-METER PATH

(12 - 18 MONTHS)

Site Selection ──► Air & Land Feasibility ──► EaaS Microgrid ──► Online Compute

By shifting from centralized grid reliance to behind-the-meter microgrids and structured EaaS contracts, we compress site delivery timelines from years to months while protecting developers from carbon accounting liabilities.

STRATEGIC FOCUS AREAS

Behind-the-Meter Microgrids

Integrating natural gas turbines, solar arrays, and battery energy storage (BESS) to bypass utility interconnect backlogs.

Energy-as-a-Service (EaaS)

Structuring off-balance-sheet financing models where third-party providers fund, build, and operate the power infrastructure.

Site Entitlement & Permitting

Navigating local environmental regulations, fuel supply letters, and zoning approvals to secure shovel-ready status.

INSIGHTS

INSIGHTS

LEADERSHIP

Brado Greene

Founder and CEO

 

The primary bottleneck holding back the AI economy isn't software architecture or chip supply; it is the physical reality of utility interconnects, air permitting, and generation capacity. As a systems and electrical engineer, I operate at the intersection of energy systems, physical compute, and venture buildout to solve these hard constraints. My focus is on accelerating speed-to-power for data center developers through Energy-as-a-Service (EaaS) structures, behind-the-meter microgrids, and local grid alignment.

​

Building on a background that spans complex engineering strategies across finance, energy, and physical systems, I approach AI deployment through a grounded, commercial lens. Scaling sovereign compute requires de-risking power assets before capital is deployed; this means aligning land options, pipeline access, and emissions compliance with hyperscaler lease mandates. I partner with infrastructure developers, energy providers, and institutional investors to structure bankable EaaS models and execute physical buildouts.

​

I hold an MS in Systems Engineering, a BS in Electrical Engineering, and a Postgraduate Certificate in AI for Business from Wharton. I also serve as the Executive Founder at Paragon, where we build ventures and advise operators on EaaS deployment, site feasibility, and sovereign compute infrastructure.

LEADERSHIP

WORK WITH PARAGON

Location: 28 W Flagler St, Miami, FL 33130

Email: brado@winwithparagon.com

Whether you are a developer struggling with a utility backlog or an infrastructure partner looking for de-risked energy assets, we provide the execution path to power.

  • Developers: Evaluate site feasibility and structure EaaS terms for your next project.

  • Investors & Funds: Access co-development opportunities in off-grid power infrastructure.

Thanks for submitting!

  • LinkedIn
CONTACT
Artificial Intelligence Services, AI Agents, AI Solutions, Machine Learning, AI Consulting

BACK TO TOP

bottom of page